发表于 2009-11-12 16:09:11
|
显示全部楼层
technical characteristics 技术参数
& C0 `/ ]! B6 O! N1/intended for transportotion of barreis with titanium sponge 想用来传输钛海绵
9 n! p5 Z2 R" T; g! R* b2/width of operation zone,mm-860 作业宽度860毫米* |/ w! E# @, g I# C
/length of operation zone,mm-2600 作业长度2600毫米0 z9 k; b6 H3 X2 |0 M! D- G. }' | G
4/type-powered conveyor 形式-电动输送带 @0 c" y( {: S6 W- h2 L
5/reverse operation mode 可以反转
V5 x: u* Y4 U1 ?6 ?# h7/conveying speed of a unil load m/s-0.02-0.25 担搁负载时速度.02-0.25米/秒
: f, V' P& n/ i7 T) E. u9/drive installed power-1.1KW6 驱动1.1千瓦5 ?! D1 N! k, n5 b, `5 a( o$ u
10/overall dimensions, length-1000 width-1250 height-470 总尺寸长1000 宽1250 高470毫米5 } \6 Q" b* ]' S
technical requirements 技术要求# @0 F7 z# U' K3 y+ M( W% H
1/roller conveyor(roll-tabie)shall comprise the following equipment:滚动输送带(辊子工作台)应包含下列设备:/ m+ c* }: i6 C$ `
1.1limit switches 限位开关5 D& f d4 |* b* z; M% b) Z7 @
1.2emergency stop switches 急停开关
% q. Y8 W: x6 v" a+ D2 `! j% [6 P; A; V2 H2/start-up and protective equipment shall be supplied in a set 启动和保护装置应成套供应
8 F6 w7 j8 `9 w3/start-up and protective equipment shall be mounted on a frame(panel) 启动和保护装置应安装在一个架子或面板上* [/ h% V( ^/ i2 [5 I3 z% C
frame size shall be provided to mount frame with equipment in the switchboard room cabinet 架子的尺寸应可以固定支架安装到控制房的控制柜上8 D2 }0 j& P: L5 @; L) q8 P0 m9 A
4/local manual contral and remote automatic contral shall be provided in the start-up equipment control circuit. equipment status signais shall be issued in party B APCS 现场手动控制和远程自动控制应提供在启动设备的控制板上. 设备状态信号应提供到"party B APCS "(不清楚)
+ x p O6 h) U# R" F' }5/provide local contral desk, IP54 equipped with mode switch for "L"(local)and"R"remote operation modes. 提供现场控制台 "IP54"(不清楚)提供现场和远程控制的转换开关.
, s, n1 v: V) F w7 z- @8 y0 r; K' H7 J# ?/ ^
不是很专业,希望能帮上你! |
|