机械社区

 找回密码
 注册会员

QQ登录

只需一步,快速开始

搜索
查看: 1858|回复: 2

工业现场控制属于强实时系统还是弱实时系统?为什么

[复制链接]
发表于 2020-2-24 22:18:14 | 显示全部楼层 |阅读模式
大家好,最近老师留了个题目(如题),我搜了一些回答,但还是不太理解,请大家帮忙点拨一下。谢谢!
回复

使用道具 举报

发表于 2020-2-25 07:25:10 | 显示全部楼层
A system is said to be real-time if the total correctness of an operation depends not only upon its logical correctness but also upon the time in which it is performed. Real-time systems, as well as their deadlines, are classified by the consequence of missing a deadline:

Hard – missing a deadline is a total system failure.
Firm – infrequent deadline misses are tolerable but may degrade the system's quality of service. The usefulness of a result is zero after its deadline.
Soft – the usefulness of a result degrades after its deadline, thereby degrading the system's quality of service.
回复 支持 反对

使用道具 举报

发表于 2020-2-25 09:31:05 | 显示全部楼层
工业现场控制,这个范围太大了。
回复 支持 反对

使用道具 举报

您需要登录后才可以回帖 登录 | 注册会员

本版积分规则

小黑屋|手机版|Archiver|机械社区 ( 京ICP备10217105号-1,京ICP证050210号,浙公网安备33038202004372号 )

GMT+8, 2024-11-30 07:53 , Processed in 0.046755 second(s), 15 queries , Gzip On.

Powered by Discuz! X3.4 Licensed

© 2001-2017 Comsenz Inc.

快速回复 返回顶部 返回列表